Satellite over the coastline. Photo by SpaceX on Unsplash

Industry

Space Tech & Satellite

Space Tech & Satellite

Launch vehicles, satellites, and in-space systems depend on propulsion, avionics, software, and manufacturing landing together. The schedule is only as good as the weakest handoff between them.

Launch vehicles, satellites, and in-space systems depend on propulsion, avionics, software, and manufacturing landing together. The schedule is only as good as the weakest handoff between them.

Overview

The mission only flies when every subsystem lands.

Space companies are built by brilliant subsystem teams. The risk sits between them: an avionics change that moves a software release, a supplier slip that reshuffles a test campaign, a requirement nobody realized had two owners.

My background is aerospace systems and avionics: systems engineering at Raytheon and Curtiss-Wright, then five years at Panasonic Avionics leading programs that integrated hardware, software, and a factory on the other side of the world. The domain is different. The integration problem is the same.

At a glance

Typical stage

Seed to Series C

Companies moving from demonstration to a repeatable build and launch cadence.

Who I work with

Founders, CTOs, COOs

Leaders who need propulsion, avionics, software, and manufacturing schedules to agree with each other.

Where it breaks

Integration

Subsystem teams optimize locally while the vehicle-level schedule quietly drifts.

How I help

One integrated plan

A cross-subsystem plan, a test and launch cadence, and status that leadership can trust.

Satellite over the coastline. Photo by SpaceX on Unsplash

"The org chart is a subsystem too. It needs integration like everything else."

Satellite over the coastline. Photo by SpaceX on Unsplash

Mark Epelbaum, Growth Translator

How I work

Every engagement is different, but integration work in space usually moves through the same three stages.

Step 1

Diagnose

I map how the vehicle or spacecraft actually gets built: subsystem owners, long-lead items, test dependencies, and the handoffs that keep slipping.

Trace long-lead items and test dependencies

Find requirements without a clear owner

Surface the risks teams stopped mentioning

Step 2

Build

I set up the integration layer: a single schedule, a decision log, and a review rhythm that spans every subsystem team.

A vehicle-level schedule tied to subsystem milestones

Cross-team readiness reviews before each test

Supplier and procurement tracking with early warnings

Step 3

Operate

I run the cadence through your next test campaign or launch milestone, then pass it on.

Run the weekly integration review

Keep investors and the board updated with accurate status

Hand the cadence to a permanent program lead

Why it works

I can follow the technical conversation in the room and still own the follow-ups that make it matter: who decides, by when, and what it unblocks.
CTA Image

Ready to unblock your execution?

If leadership time is consumed by cross-functional coordination, engineering and business teams are talking past each other, and execution speed isn't matching your ambition — let's talk. Thirty minutes is enough to know if there's a fit.

CTA Image

Ready to unblock your execution?

If leadership time is consumed by cross-functional coordination, engineering and business teams are talking past each other, and execution speed isn't matching your ambition — let's talk. Thirty minutes is enough to know if there's a fit.

CTA Image

Ready to unblock your execution?

If leadership time is consumed by cross-functional coordination, engineering and business teams are talking past each other, and execution speed isn't matching your ambition — let's talk. Thirty minutes is enough to know if there's a fit.