The mission only flies when every subsystem lands.
Space companies are built by brilliant subsystem teams. The risk sits between them: an avionics change that moves a software release, a supplier slip that reshuffles a test campaign, a requirement nobody realized had two owners.
My background is aerospace systems and avionics: systems engineering at Raytheon and Curtiss-Wright, then five years at Panasonic Avionics leading programs that integrated hardware, software, and a factory on the other side of the world. The domain is different. The integration problem is the same.
At a glance
Typical stage
Seed to Series C
Companies moving from demonstration to a repeatable build and launch cadence.
Who I work with
Founders, CTOs, COOs
Leaders who need propulsion, avionics, software, and manufacturing schedules to agree with each other.
Where it breaks
Integration
Subsystem teams optimize locally while the vehicle-level schedule quietly drifts.
How I help
One integrated plan
A cross-subsystem plan, a test and launch cadence, and status that leadership can trust.

"The org chart is a subsystem too. It needs integration like everything else."

Mark Epelbaum, Growth Translator
How I work
Every engagement is different, but integration work in space usually moves through the same three stages.
Step 1
Diagnose
I map how the vehicle or spacecraft actually gets built: subsystem owners, long-lead items, test dependencies, and the handoffs that keep slipping.
Trace long-lead items and test dependencies
Find requirements without a clear owner
Surface the risks teams stopped mentioning
Step 2
Build
I set up the integration layer: a single schedule, a decision log, and a review rhythm that spans every subsystem team.
A vehicle-level schedule tied to subsystem milestones
Cross-team readiness reviews before each test
Supplier and procurement tracking with early warnings
Step 3
Operate
I run the cadence through your next test campaign or launch milestone, then pass it on.
Run the weekly integration review
Keep investors and the board updated with accurate status
Hand the cadence to a permanent program lead